What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Loughborough?
In Loughborough, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). We start from a UK-wide guide and adjust it for the East Midlands, where labour and materials are typically about 5% below average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,500 |
| Larger or more complex projects | £2,500–£3,000 |
The main things that change the cost:
- Revisions requested by the council
- Type of application
- Planning conditions
- Party wall surveyor appointments
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Loughborough
The approval route for Loughborough is set by planning law in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical planning or building regulations application we handle:
- Lawful development certificate applications
- Permitted development assessment
- Prior approval (larger home extension) in England
- Building control application and inspections
- Planning or householder applications
- Build-over agreements with the water company
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Loughborough
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
If your home is in Loughborough or close by in Coalville, Leicester and Long Eaton, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Loughborough
Do you handle planning and building regulations applications in Loughborough?
Yes. We handle planning and building regulations applications across Loughborough, including postcodes LE11. Every project starts with a free home visit.
Do I need a party wall agreement?
In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.
How much does a planning or building regulations application cost in Loughborough?
In Loughborough, a planning or building regulations application typically costs £750–£2,500 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.