What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Northumberland?
In Northumberland, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). That range is adjusted for the North East, where domestic building work typically costs around 10% below the national average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
What moves the price most:
- Party wall surveyor appointments
- Council fees
- Planning conditions
- Type of application
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Northumberland
The approval route for Northumberland is set by planning law in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a planning or building regulations application:
- Discharge of planning conditions
- Party wall notices
- Build-over agreements with the water company
- Lawful development certificate applications
- Planning or householder applications
- Building control application and inspections
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Northumberland
The North East has many terraced streets and post-war semis, where rear extensions and loft conversions are popular ways to gain space.
Towns we cover in Northumberland include Blyth, Cramlington, Ashington and Bedlington.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Northumberland
How much does a planning or building regulations application cost in Northumberland?
In Northumberland, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
Do you handle planning and building regulations applications in Northumberland?
Yes. We handle planning and building regulations applications across Northumberland, including postcodes CA9, DH8, NE15, NE18 and NE19. Every project starts with a free home visit.
Who carries out building control?
Either the council’s building control service or, in England and Wales, a private building control body registered to do the work. In Scotland and Northern Ireland building control is provided by the council.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.