What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Pinner?
In Pinner, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Pinner. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £1,000–£3,250 |
| Larger or more complex projects | £3,250–£4,000 |
The main things that change the cost:
- Revisions requested by the council
- Building control route
- Planning conditions
- Council fees
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Planning and building regulations in Pinner
Approvals for a planning or building regulations application in Pinner follow the rules for England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Build-over agreements with the water company
- Discharge of planning conditions
- Prior approval (larger home extension) in England
- Party wall notices
- Building control application and inspections
- Permitted development assessment
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Pinner
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
If your home is in Pinner or close by in Ruislip, Harrow and Northolt, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Pinner
How much does a planning or building regulations application cost in Pinner?
In Pinner, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
Do you handle planning and building regulations applications in Pinner?
Yes. We handle planning and building regulations applications across Pinner, including postcodes HA5. Every project starts with a free home visit.
Who carries out building control?
Either the council’s building control service or, in England and Wales, a private building control body registered to do the work. In Scotland and Northern Ireland building control is provided by the council.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.