What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Romford?
In Romford, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Building costs in London run about 30% above the UK average, and the figures for Romford are adjusted to reflect that. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £1,000–£3,250 |
| Larger or more complex projects | £3,250–£4,000 |
What moves the price most:
- Revisions requested by the council
- Council fees
- Planning conditions
- Building control route
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Romford
Whether you need planning permission depends on your house and its location in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
On a typical planning or building regulations application we handle:
- Permitted development assessment
- Discharge of planning conditions
- Planning or householder applications
- Party wall notices
- Lawful development certificate applications
- Building control application and inspections
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Romford
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
Romford sits in Greater London, about 14 miles east of central London. We cover the whole of Romford, including postcodes RM1.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Romford
Do you handle planning and building regulations applications in Romford?
Yes. We handle planning and building regulations applications across Romford, including postcodes RM1. Every project starts with a free home visit.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
How much does a planning or building regulations application cost in Romford?
In Romford, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Who carries out building control?
Either the council’s building control service or, in England and Wales, a private building control body registered to do the work. In Scotland and Northern Ireland building control is provided by the council.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
