What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Runcorn?
In Runcorn, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Building costs in the North West run about 6% below the UK average, and the figures for Runcorn are adjusted to reflect that. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
The main things that change the cost:
- Building control route
- Type of application
- Party wall surveyor appointments
- Council fees
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Runcorn
The approval route for Runcorn is set by planning law in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Discharge of planning conditions
- Permitted development assessment
- Build-over agreements with the water company
- Party wall notices
- Lawful development certificate applications
- Planning or householder applications
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Runcorn
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Runcorn sits in Cheshire, about 12 miles north-east of Chester. We cover the whole of Runcorn, including postcodes WA7.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Runcorn
Do I need a party wall agreement?
In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.
Do you handle planning and building regulations applications in Runcorn?
Yes. We handle planning and building regulations applications across Runcorn, including postcodes WA7. Every project starts with a free home visit.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
How much does a planning or building regulations application cost in Runcorn?
In Runcorn, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.