Planning and building regulations in Sunderland

From the first sketch to approval, we look after planning and building regulations applications for projects in Sunderland and the surrounding parts of Tyne and Wear.

Guide price in Sunderland

£750–£2,250 for application management (council fees extra)

In Sunderland, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT).

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a planning or building regulations application?

Surveyor measuring the rear of a brick semi-detached house with a laser measure

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.

How much does a planning or building regulations application cost in Sunderland?

In Sunderland, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Prices across the North East are typically 10% below the UK average for this kind of work, which is reflected in the range for Sunderland. Council application fees are extra.

Guide prices for Sunderland, including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT)
Size or typeGuide range
Application management (council fees extra)£750–£2,250
Larger or more complex projects£2,250–£2,750

The main things that change the cost:

  • Building control route
  • Party wall surveyor appointments
  • Revisions requested by the council
  • Type of application

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Planning and building regulations in Sunderland

Here is how the rules work for a planning or building regulations application in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

We check this for your address before design work starts, so there are no surprises later.

What we handle

Handled as part of most planning and building regulations applications:

  • Lawful development certificate applications
  • Party wall notices
  • Build-over agreements with the water company
  • Permitted development assessment
  • Planning or householder applications
  • Building control application and inspections

How long does it take?

Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.

Building in Sunderland

The North East has many terraced streets and post-war semis, where rear extensions and loft conversions are popular ways to gain space.

From SR1 outwards, we take on projects throughout Sunderland and the surrounding parts of Tyne and Wear.

How it works

  1. 01

    Measured survey

    We visit and measure the house so the drawings start from accurate information.

  2. 02

    Design options

    Sketch layouts to agree the approach before detailed drawing starts.

  3. 03

    Application drawings

    Plans, elevations and supporting documents prepared for the council.

  4. 04

    Submission and follow-up

    We submit the application and deal with questions from the council or building control.

Questions about planning and building regulations applications in Sunderland

How much does a planning or building regulations application cost in Sunderland?

In Sunderland, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.

What is a lawful development certificate?

A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.

Do I need a party wall agreement?

In England and Wales, if your work affects a shared wall, boundary or nearby foundations, notices must be served. Neighbours can consent or appoint surveyors.

What happens if I build without approval?

The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.

Do you handle planning and building regulations applications in Sunderland?

Yes. We handle planning and building regulations applications across Sunderland, including postcodes SR1 and SR9. Every project starts with a free home visit.

Tell us about your project in Sunderland and we will arrange a free home visit.