What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Westminster?
In Westminster, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). The guide for Westminster reflects typical costs in London, roughly 30% above the UK-wide figure. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £1,000–£3,250 |
| Larger or more complex projects | £3,250–£4,000 |
Your quote will depend mainly on:
- Revisions requested by the council
- Building control route
- Council fees
- Party wall surveyor appointments
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Planning and building regulations in Westminster
Whether you need planning permission depends on your house and its location in England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Party wall notices
- Lawful development certificate applications
- Planning or householder applications
- Build-over agreements with the water company
- Prior approval (larger home extension) in England
- Permitted development assessment
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Westminster
Many London boroughs have conservation areas and detailed design guides, so early design advice saves time at the planning stage.
From SW1 outwards, we take on projects throughout Westminster and the surrounding parts of Greater London.
How it works
- 01
Survey and brief
We visit, talk through what you want and record the existing building.
- 02
Design options
Sketch layouts to agree the approach before detailed drawing starts.
- 03
Drawings and documents
The drawings and forms the council and building control need.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Westminster
Do you handle planning and building regulations applications in Westminster?
Yes. We handle planning and building regulations applications across Westminster, including postcodes SW1. Every project starts with a free home visit.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
How much does a planning or building regulations application cost in Westminster?
In Westminster, a planning or building regulations application typically costs £1,000–£3,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
What is the difference between planning permission and building regulations?
Planning permission controls what you build and how it looks and affects neighbours. Building regulations control how it is built: structure, fire safety, insulation and drainage.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
