What is a planning or building regulations application?

Planning permission decides whether a project can be built; building regulations decide how it must be built. Most extensions, lofts and conversions need building regulations approval even when planning permission is not required.
How much does a planning or building regulations application cost in Whitefield?
In Whitefield, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). That range is adjusted for the North West, where domestic building work typically costs around 6% below the national average. Council application fees are extra.
| Size or type | Guide range |
|---|---|
| Application management (council fees extra) | £750–£2,250 |
| Larger or more complex projects | £2,250–£2,750 |
Your quote will depend mainly on:
- Party wall surveyor appointments
- Revisions requested by the council
- Building control route
- Council fees
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Planning and building regulations in Whitefield
Approvals for a planning or building regulations application in Whitefield follow the rules for England. In England householder applications, lawful development certificates and prior approvals for larger home extensions go to the local planning authority. Building control can be the council or a registered building control approver.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a planning or building regulations application:
- Build-over agreements with the water company
- Permitted development assessment
- Party wall notices
- Prior approval (larger home extension) in England
- Discharge of planning conditions
- Lawful development certificate applications
How long does it take?
Allow about 8 weeks for a householder planning decision (two months in Scotland). If the drawings are for a planning application, add the council’s decision period once they are submitted.
Building in Whitefield
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
We work across Whitefield and neighbouring areas such as Radcliffe, Prestwich and Bury. Postcodes we cover in Whitefield include M45.
How it works
- 01
Measured survey
We visit and measure the house so the drawings start from accurate information.
- 02
Concept design
Options for layout and appearance, revised until you are happy.
- 03
Application drawings
Plans, elevations and supporting documents prepared for the council.
- 04
Approval
We follow the application through to a decision and pass on the approved drawings.
Questions about planning and building regulations applications in Whitefield
How much does a planning or building regulations application cost in Whitefield?
In Whitefield, a planning or building regulations application typically costs £750–£2,250 for application management (council fees extra), including VAT at 20% (standard rate; planning application fees carry no VAT, council building control fees include VAT). Your fixed price depends on the survey and drawings.
Do you handle planning and building regulations applications in Whitefield?
Yes. We handle planning and building regulations applications across Whitefield, including postcodes M45. Every project starts with a free home visit.
What is a lawful development certificate?
A certificate from the council confirming that a project is permitted development. It is optional but useful when selling the house.
What happens if I build without approval?
The council can take enforcement action, and missing approvals cause problems when selling. It is always better to get approvals first.
How long does a planning decision take?
Councils aim to decide most householder applications within 8 weeks.
