County AntrimSide extensions

Side extensions in Ballymena

A side extension in Ballymena starts with understanding the house: its age, its structure and its plot. We survey, design, apply for approvals and build, all under one contract.

Guide price in Ballymena

£1,450–£2,300 per m² of floor area

In Ballymena, a side extension typically costs £1,450–£2,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £40,500–£64,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side extension?

Two-storey side extension in matching red brick on a semi-detached house with a block-paved drive

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.

How much does a side extension cost in Ballymena?

In Ballymena, a side extension typically costs £1,450–£2,300 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £40,500–£64,500. Prices across Northern Ireland are typically 14% below the UK average for this kind of work, which is reflected in the range for Ballymena. Design, structural calculations and council fees are extra.

Guide prices for Ballymena, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£29,000–£46,000
Typical project (28 m²)£40,500–£64,500
Larger project (39 m²)£56,500–£89,500
Rate per m²£1,450–£2,300

The biggest cost drivers are:

  • Steel work where the side wall is opened
  • Boundary walls and access for materials
  • Internal fit-out of the new rooms
  • Roof design and tile matching

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a side extension in Ballymena?

The approval route for Ballymena is set by planning law in Northern Ireland. In Northern Ireland a single-storey side extension can be permitted development if it is no more than 4 metres high, no wider than half the original house and not beside a wall facing a road. Side extensions of more than one storey need planning permission.

Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.

We check this for your address before design work starts, so there are no surprises later.

What we handle

The work we manage on a side extension:

  • Survey of the boundary, drains and access
  • Walls, roof and windows to match the house
  • Opening into the existing house
  • Building control completion
  • Foundations and drainage alterations
  • Electrics, heating and plastering

How long does it take?

Build time is typically 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.

Building in Ballymena

Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.

Projects in Ballymena (BT42, BT43 and BT44) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Free visit

    We look at the property, talk through what you want and measure up. There is no charge and no obligation.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Approvals in place

    We handle planning, building control and neighbour notices before work starts.

  4. 04

    Build and sign-off

    We run the build to a written programme and hand over the completion certificate.

Questions about side extensions in Ballymena

Who approves a side extension in Ballymena?

Planning matters in Ballymena go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

Will I lose my driveway?

A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.

How long does it take?

Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.

Can a side extension go over a drain?

Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.

Do I need planning permission for a side extension in Ballymena?

In Northern Ireland a single-storey side extension can be permitted development if it is no more than 4 metres high, no wider than half the original house and not beside a wall facing a road. Side extensions of more than one storey need planning permission.

How much does a side extension cost in Ballymena?

In Ballymena, a side extension typically costs £1,450–£2,300 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £40,500–£64,500. Your fixed price depends on the survey and drawings.

Tell us about your project in Ballymena and we will arrange a free home visit.

Call 0800 088 6248 or get an instant guide price online.