What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Bedfordshire?
In Bedfordshire, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £50,500–£78,500. That range is adjusted for the East of England, where domestic building work typically costs around 6% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £36,000–£56,000 |
| Typical project (28 m²) | £50,500–£78,500 |
| Larger project (39 m²) | £70,000–£109,000 |
| Rate per m² | £1,800–£2,800 |
The biggest cost drivers are:
- Single or two storeys
- Drains, gas meters or soil pipes that need moving
- Internal fit-out of the new rooms
- Steel work where the side wall is opened
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side extension in Bedfordshire?
Whether you need planning permission depends on your house and its location in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Survey of the boundary, drains and access
- Electrics, heating and plastering
- Building control completion
- Opening into the existing house
- Foundations and drainage alterations
- Structural calculations
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Bedfordshire
Across the East of England, 1930s and post-war semis, newer estates and rural cottages all feature, each with different extension and loft options.
Towns we cover in Bedfordshire include Luton, Bedford, Dunstable, Leighton Buzzard, Ampthill and Kempston Hardwick.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Bedfordshire
How much does a side extension cost in Bedfordshire?
In Bedfordshire, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £50,500–£78,500. Your fixed price depends on the survey and drawings.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
How long does a side extension take in Bedfordshire?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
Can I build a side extension without planning permission?
In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the original house, and the house is not in a conservation area or similar protected land. Two-storey side extensions always need planning permission.