What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Belper?
In Belper, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£70,000. We start from a UK-wide guide and adjust it for the East Midlands, where labour and materials are typically about 5% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £32,000–£50,000 |
| Typical project (28 m²) | £45,000–£70,000 |
| Larger project (39 m²) | £62,500–£97,500 |
| Rate per m² | £1,600–£2,500 |
The biggest cost drivers are:
- Internal fit-out of the new rooms
- Drains, gas meters or soil pipes that need moving
- Boundary walls and access for materials
- Single or two storeys
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side extension in Belper?
Before anything is built in Belper, we confirm which approvals apply in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most side extensions:
- Structural calculations
- Walls, roof and windows to match the house
- Planning drawings and application
- Foundations and drainage alterations
- Electrics, heating and plastering
- Survey of the boundary, drains and access
How long does it take?
The build itself usually takes 10 to 16 weeks on site depending on size and storeys. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Belper
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
We work across Belper and neighbouring areas such as Ripley, Heanor and Alfreton. Postcodes we cover in Belper include DE56.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Belper
How long does a side extension take in Belper?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
How much does a side extension cost in Belper?
In Belper, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £45,000–£70,000. Your fixed price depends on the survey and drawings.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Can I build a side extension without planning permission?
In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the original house, and the house is not in a conservation area or similar protected land. Two-storey side extensions always need planning permission.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.