What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Bentley?
In Bentley, a side extension typically costs £1,600–£2,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£68,500. Building costs in Yorkshire and the Humber run about 7% below the UK average, and the figures for Bentley are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £32,000–£49,000 |
| Typical project (28 m²) | £45,000–£68,500 |
| Larger project (39 m²) | £62,500–£95,500 |
| Rate per m² | £1,600–£2,450 |
What moves the price most:
- Single or two storeys
- Internal fit-out of the new rooms
- Boundary walls and access for materials
- Roof design and tile matching
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Bentley?
Approvals for a side extension in Bentley follow the rules for England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Structural calculations
- Opening into the existing house
- Walls, roof and windows to match the house
- Survey of the boundary, drains and access
- Building control completion
- Planning drawings and application
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Bentley
Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.
If your home is in Bentley or close by in Doncaster, Adwick le Street and South Elmsall, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Bentley
Can I build a side extension without planning permission?
In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the original house, and the house is not in a conservation area or similar protected land. Two-storey side extensions always need planning permission.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
How much does a side extension cost in Bentley?
In Bentley, a side extension typically costs £1,600–£2,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £45,000–£68,500. Your fixed price depends on the survey and drawings.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
How long does a side extension take in Bentley?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.