What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in East Dereham?
In East Dereham, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £50,500–£78,500. The guide for East Dereham reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £36,000–£56,000 |
| Typical project (28 m²) | £50,500–£78,500 |
| Larger project (39 m²) | £70,000–£109,000 |
| Rate per m² | £1,800–£2,800 |
The biggest cost drivers are:
- Steel work where the side wall is opened
- Boundary walls and access for materials
- Internal fit-out of the new rooms
- Roof design and tile matching
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side extension in East Dereham?
Here is how the rules work for a side extension in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Building control completion
- Walls, roof and windows to match the house
- Opening into the existing house
- Electrics, heating and plastering
- Planning drawings and application
- Structural calculations
How long does it take?
The build itself usually takes 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in East Dereham
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Projects in East Dereham (NR19) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in East Dereham
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Do you build side extensions in East Dereham?
Yes. We build side extensions across East Dereham, including postcodes NR19. Every project starts with a free home visit.
How much does a side extension cost in East Dereham?
In East Dereham, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £50,500–£78,500. Your fixed price depends on the survey and drawings.