What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Eastbourne?
In Eastbourne, a side extension typically costs £1,900–£2,950 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £53,000–£82,500. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Eastbourne. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £38,000–£59,000 |
| Typical project (28 m²) | £53,000–£82,500 |
| Larger project (39 m²) | £74,000–£115,000 |
| Rate per m² | £1,900–£2,950 |
What moves the price most:
- Roof design and tile matching
- Steel work where the side wall is opened
- Boundary walls and access for materials
- Drains, gas meters or soil pipes that need moving
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side extension in Eastbourne?
Here is how the rules work for a side extension in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Walls, roof and windows to match the house
- Opening into the existing house
- Electrics, heating and plastering
- Planning drawings and application
- Building control completion
- Structural calculations
How long does it take?
The build itself usually takes 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Eastbourne
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Eastbourne sits in East Sussex, about 19 miles east of Brighton. We cover the whole of Eastbourne, including postcodes BN21.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Eastbourne
Who approves a side extension in Eastbourne?
Planning matters in Eastbourne go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a side extension cost in Eastbourne?
In Eastbourne, a side extension typically costs £1,900–£2,950 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £53,000–£82,500. Your fixed price depends on the survey and drawings.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.