What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Falkirk?
In Falkirk, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £46,000–£71,500. Building costs in Scotland are close to the UK average, so the figures for Falkirk are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £33,000–£51,000 |
| Typical project (28 m²) | £46,000–£71,500 |
| Larger project (39 m²) | £64,500–£99,500 |
| Rate per m² | £1,650–£2,550 |
The main things that change the cost:
- Steel work where the side wall is opened
- Roof design and tile matching
- Boundary walls and access for materials
- Single or two storeys
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Falkirk?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
Handled as part of most side extensions:
- Planning drawings and application
- Structural calculations
- Opening into the existing house
- Building control completion
- Survey of the boundary, drains and access
- Electrics, heating and plastering
How long does it take?
Allow 10 to 16 weeks on site depending on size and storeys. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Falkirk
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Projects in Falkirk (FK1) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side extensions in Falkirk
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.
How much does a side extension cost in Falkirk?
In Falkirk, a side extension typically costs £1,650–£2,550 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £46,000–£71,500. Your fixed price depends on the survey and drawings.
Do you build side extensions in Falkirk?
Yes. We build side extensions across Falkirk, including postcodes FK1. Every project starts with a free home visit.
Do I need planning permission for a side extension in Falkirk?
In Scotland single-storey side extensions can be permitted development if they do not come forward of a side wall facing a road and stay within the height and boundary limits. Two-storey side extensions usually need planning permission, and a building warrant is needed before work starts.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.