What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Garston?
In Garston, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£70,000. Building costs in the North West run about 6% below the UK average, and the figures for Garston are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £32,000–£50,000 |
| Typical project (28 m²) | £45,000–£70,000 |
| Larger project (39 m²) | £62,500–£97,500 |
| Rate per m² | £1,600–£2,500 |
The main things that change the cost:
- Roof design and tile matching
- Internal fit-out of the new rooms
- Single or two storeys
- Steel work where the side wall is opened
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Garston?
The approval route for Garston is set by planning law in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a side extension:
- Structural calculations
- Opening into the existing house
- Building control completion
- Survey of the boundary, drains and access
- Walls, roof and windows to match the house
- Electrics, heating and plastering
How long does it take?
Build time is typically 10 to 16 weeks on site depending on size and storeys. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Garston
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
From L19 outwards, we take on projects throughout Garston and the surrounding parts of Merseyside.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side extensions in Garston
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How much does a side extension cost in Garston?
In Garston, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £45,000–£70,000. Your fixed price depends on the survey and drawings.
Do you build side extensions in Garston?
Yes. We build side extensions across Garston, including postcodes L19. Every project starts with a free home visit.
Can I build a side extension without planning permission?
In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the original house, and the house is not in a conservation area or similar protected land. Two-storey side extensions always need planning permission.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.