What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Harpenden?
In Harpenden, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £50,500–£78,500. We start from a UK-wide guide and adjust it for the East of England, where labour and materials are typically about 6% above average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £36,000–£56,000 |
| Typical project (28 m²) | £50,500–£78,500 |
| Larger project (39 m²) | £70,000–£109,000 |
| Rate per m² | £1,800–£2,800 |
The biggest cost drivers are:
- Internal fit-out of the new rooms
- Boundary walls and access for materials
- Drains, gas meters or soil pipes that need moving
- Roof design and tile matching
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side extension in Harpenden?
Here is how the rules work for a side extension in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a side extension:
- Electrics, heating and plastering
- Building control completion
- Survey of the boundary, drains and access
- Walls, roof and windows to match the house
- Structural calculations
- Planning drawings and application
How long does it take?
Expect 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Harpenden
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
We work across Harpenden and neighbouring areas such as St Albans, Luton and Hemel Hempstead. Postcodes we cover in Harpenden include AL5.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Harpenden
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
How much does a side extension cost in Harpenden?
In Harpenden, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £50,500–£78,500. Your fixed price depends on the survey and drawings.
Do you build side extensions in Harpenden?
Yes. We build side extensions across Harpenden, including postcodes AL5. Every project starts with a free home visit.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.