What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Harwich?
In Harwich, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £50,500–£78,500. The guide for Harwich reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £36,000–£56,000 |
| Typical project (28 m²) | £50,500–£78,500 |
| Larger project (39 m²) | £70,000–£109,000 |
| Rate per m² | £1,800–£2,800 |
The main things that change the cost:
- Boundary walls and access for materials
- Internal fit-out of the new rooms
- Steel work where the side wall is opened
- Roof design and tile matching
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Harwich?
Approvals for a side extension in Harwich follow the rules for England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
On a typical side extension we handle:
- Opening into the existing house
- Building control completion
- Structural calculations
- Survey of the boundary, drains and access
- Electrics, heating and plastering
- Foundations and drainage alterations
How long does it take?
The build itself usually takes 10 to 16 weeks on site depending on size and storeys. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Harwich
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Our Harwich coverage includes postcode districts CO12, and we also work in nearby places such as Felixstowe, Ipswich and Clacton-on-Sea.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Harwich
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.
How much does a side extension cost in Harwich?
In Harwich, a side extension typically costs £1,800–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £50,500–£78,500. Your fixed price depends on the survey and drawings.
Who approves a side extension in Harwich?
Planning matters in Harwich go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.