What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Hull?
In Hull, a side extension typically costs £1,600–£2,450 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£68,500. Building costs in Yorkshire and the Humber run about 7% below the UK average, and the figures for Hull are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £32,000–£49,000 |
| Typical project (28 m²) | £45,000–£68,500 |
| Larger project (39 m²) | £62,500–£95,500 |
| Rate per m² | £1,600–£2,450 |
Your quote will depend mainly on:
- Roof design and tile matching
- Drains, gas meters or soil pipes that need moving
- Internal fit-out of the new rooms
- Single or two storeys
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side extension in Hull?
Before anything is built in Hull, we confirm which approvals apply in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a side extension:
- Walls, roof and windows to match the house
- Planning drawings and application
- Building control completion
- Structural calculations
- Opening into the existing house
- Foundations and drainage alterations
How long does it take?
The build itself usually takes 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Hull
Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.
We work across Hull and neighbouring areas such as Beverley, Brough and Grimsby. Postcodes we cover in Hull include HU2, HU3, HU4 and HU5.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side extensions in Hull
How much does a side extension cost in Hull?
In Hull, a side extension typically costs £1,600–£2,450 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £45,000–£68,500. Your fixed price depends on the survey and drawings.
How close to the boundary can I build?
You can build up to the boundary, but the eaves height near it is limited under permitted development, and planning officers often want a gap at first floor. If you build on or near a shared boundary, party wall rules may apply.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Will a two-storey side extension look odd?
Not if it is designed well. Setting it back from the front and keeping the roof lower than the main ridge usually gives a natural look and is what most councils ask for.
How long does a side extension take in Hull?
Typically 10 to 16 weeks on site depending on size and storeys. Design and approvals beforehand usually take 3 to 4 months.
