What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Prescot?
In Prescot, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£70,000. Prices across the North West are typically 6% below the UK average for this kind of work, which is reflected in the range for Prescot. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £32,000–£50,000 |
| Typical project (28 m²) | £45,000–£70,000 |
| Larger project (39 m²) | £62,500–£97,500 |
| Rate per m² | £1,600–£2,500 |
The biggest cost drivers are:
- Single or two storeys
- Internal fit-out of the new rooms
- Boundary walls and access for materials
- Roof design and tile matching
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side extension in Prescot?
Before anything is built in Prescot, we confirm which approvals apply in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Survey of the boundary, drains and access
- Structural calculations
- Electrics, heating and plastering
- Planning drawings and application
- Foundations and drainage alterations
- Building control completion
How long does it take?
Expect 10 to 16 weeks on site depending on size and storeys. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Prescot
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
From L34 outwards, we take on projects throughout Prescot and the surrounding parts of Merseyside.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side extensions in Prescot
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.
Who approves a side extension in Prescot?
Planning matters in Prescot go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a side extension cost in Prescot?
In Prescot, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £45,000–£70,000. Your fixed price depends on the survey and drawings.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.