SK Developments Free home visit0800 088 6248 Get a quote

Greater ManchesterSide extensions

Side extensions in Royton

Our side extension service covers Royton and the surrounding parts of Greater Manchester. Every project starts with a free visit and ends with a completion certificate.

Guide price in Royton

£1,600–£2,500 per m² of floor area

In Royton, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£70,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side extension?

Two-storey side extension in matching red brick on a semi-detached house with a block-paved drive

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.

How much does a side extension cost in Royton?

In Royton, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £45,000–£70,000. That range is adjusted for the North West, where domestic building work typically costs around 6% below the national average. Design, structural calculations and council fees are extra.

Guide prices for Royton, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (20 m²)£32,000–£50,000
Typical project (28 m²)£45,000–£70,000
Larger project (39 m²)£62,500–£97,500
Rate per m²£1,600–£2,500

The biggest cost drivers are:

  • Single or two storeys
  • Boundary walls and access for materials
  • Drains, gas meters or soil pipes that need moving
  • Internal fit-out of the new rooms

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a side extension in Royton?

Here is how the rules work for a side extension in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.

What we handle

On a typical side extension we handle:

  • Foundations and drainage alterations
  • Planning drawings and application
  • Structural calculations
  • Walls, roof and windows to match the house
  • Survey of the boundary, drains and access
  • Opening into the existing house

How long does it take?

The build itself usually takes 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in Royton

The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.

Royton sits in Greater Manchester, about 8 miles north-east of Manchester. We cover the whole of Royton, including postcodes OL2.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and pricing

    Design options, then a fixed quote based on the chosen drawings and specification.

  3. 03

    Approvals

    Planning or permitted development confirmation, building regulations and any party wall matters.

  4. 04

    Build and handover

    Work follows the agreed programme, with inspections along the way and a completion certificate at the end.

Questions about side extensions in Royton

How long does it take?

Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.

Will I lose my driveway?

A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.

Who approves a side extension in Royton?

Planning matters in Royton go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

How much does a side extension cost in Royton?

In Royton, a side extension typically costs £1,600–£2,500 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £45,000–£70,000. Your fixed price depends on the survey and drawings.

Can a side extension go over a drain?

Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.

Start with a guide price, then book a free survey for a fixed quote in Royton.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price