What is a side extension?

A side extension builds into the space beside a semi-detached or detached house, often over a driveway or side passage. It can be single-storey, for a utility room, downstairs toilet or study, or two-storey to add a bedroom above.
How much does a side extension cost in Yate?
In Yate, a side extension typically costs £1,750–£2,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 28 m² project that is roughly £49,000–£75,500. Prices in the South West sit near the national average for this kind of work, and the range for Yate reflects that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (20 m²) | £35,000–£54,000 |
| Typical project (28 m²) | £49,000–£75,500 |
| Larger project (39 m²) | £68,000–£105,500 |
| Rate per m² | £1,750–£2,700 |
Your quote will depend mainly on:
- Roof design and tile matching
- Boundary walls and access for materials
- Internal fit-out of the new rooms
- Single or two storeys
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side extension in Yate?
The approval route for Yate is set by planning law in England. In England a single-storey side extension can be permitted development if it is no more than 4 metres high and no wider than half the width of the original house. Side extensions of more than one storey always need planning permission, as do side extensions in conservation areas, National Parks and National Landscapes.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
What we take care of:
- Electrics, heating and plastering
- Opening into the existing house
- Survey of the boundary, drains and access
- Planning drawings and application
- Building control completion
- Foundations and drainage alterations
How long does it take?
Expect 10 to 16 weeks on site depending on size and storeys. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Yate
In parts of the South West, protected landscapes and conservation areas shape what can be built, so materials and roof forms are chosen carefully.
If your home is in Yate or close by in Mangotsfield, Kingswood and Keynsham, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side extensions in Yate
How much does a side extension cost in Yate?
In Yate, a side extension typically costs £1,750–£2,700 per m² of floor area, including VAT at 20% (standard rate). A typical 28 m² project comes to roughly £49,000–£75,500. Your fixed price depends on the survey and drawings.
How long does it take?
Roughly 10 to 16 weeks on site once approvals are in place, depending on whether it is one or two storeys.
Can a side extension go over a drain?
Often yes, with a build-over agreement from the water company or by rerouting the drain. We check this during the survey.
Who approves a side extension in Yate?
Planning matters in Yate go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Will I lose my driveway?
A side extension often takes the side drive. We look at whether parking can be kept at the front and whether a dropped kerb is needed.