What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Ballymena?
In Ballymena, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £24,000–£34,000. Prices across Northern Ireland are typically 14% below the UK average for this kind of work, which is reflected in the range for Ballymena. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £16,000–£23,000 |
| Typical project (12 m²) | £24,000–£34,000 |
| Larger project (17 m²) | £34,000–£48,500 |
| Rate per m² | £2,000–£2,850 |
The main things that change the cost:
- Access through the house for materials
- Length of the side return
- Moving drains and soil stacks
- Glazed roof specification
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side return extension in Ballymena?
Here is how the rules work for a side return extension in Northern Ireland. In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
In Northern Ireland building control approval comes from the council, usually through a full plans application or a building notice, with inspections during the work and a completion certificate at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
From survey to sign-off, the job normally involves:
- Glazed or solid roof with insulation
- Floor levelling, heating and electrics
- Steel beams to remove the side wall
- Drawings and planning or permitted development check
- Foundations and drainage, including any build-over agreement
- Building control sign-off
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Ballymena
Northern Ireland has many detached and semi-detached homes on generous plots, which suits single-storey rear extensions and garage conversions.
From BT42 outwards, we take on projects throughout Ballymena and the surrounding parts of County Antrim.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Ballymena
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How much does a side return extension cost in Ballymena?
In Ballymena, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £24,000–£34,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a side return extension in Ballymena?
In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
How long does a side return extension take in Ballymena?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.