What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Brough?
In Brough, a side return extension typically costs £2,150–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £26,000–£36,500. The guide for Brough reflects typical costs in Yorkshire and the Humber, roughly 7% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £17,000–£24,500 |
| Typical project (12 m²) | £26,000–£36,500 |
| Larger project (17 m²) | £36,500–£52,000 |
| Rate per m² | £2,150–£3,050 |
The biggest cost drivers are:
- Glazed roof specification
- Party wall surveyor fees
- Length of the side return
- Steel beams and propping of the back addition
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Brough?
The approval route for Brough is set by planning law in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical side return extension we handle:
- Glazed or solid roof with insulation
- Survey of party walls, drains and the existing back addition
- Building control sign-off
- Floor levelling, heating and electrics
- Foundations and drainage, including any build-over agreement
- Drawings and planning or permitted development check
How long does it take?
Build time is typically 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Brough
Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.
If your home is in Brough or close by in Hull, Beverley and Scunthorpe, a free home visit is the first step.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side return extensions in Brough
How much does a side return extension cost in Brough?
In Brough, a side return extension typically costs £2,150–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £26,000–£36,500. Your fixed price depends on the survey and drawings.
How long does a side return extension take in Brough?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Does a side return extension need planning permission?
It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Will I need a party wall agreement?
Almost certainly in England and Wales, because side returns sit on or near the boundary. Notices must be served before work starts, and a party wall surveyor may be appointed if the neighbour does not consent.
