What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Burgess Hill?
In Burgess Hill, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £31,000–£44,500. The guide for Burgess Hill reflects typical costs in the South East, roughly 12% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £21,000–£29,500 |
| Typical project (12 m²) | £31,000–£44,500 |
| Larger project (17 m²) | £44,000–£63,000 |
| Rate per m² | £2,600–£3,700 |
Your quote will depend mainly on:
- Moving drains and soil stacks
- Length of the side return
- Glazed roof specification
- Steel beams and propping of the back addition
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a side return extension in Burgess Hill?
Approvals for a side return extension in Burgess Hill follow the rules for England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Glazed or solid roof with insulation
- Floor levelling, heating and electrics
- Survey of party walls, drains and the existing back addition
- Steel beams to remove the side wall
- Drawings and planning or permitted development check
- Party wall advice and notices
How long does it take?
Expect 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Burgess Hill
Commuter towns across the South East have many 1930s and post-war semis that suit rear extensions and hip-to-gable loft conversions.
From RH15 outwards, we take on projects throughout Burgess Hill and the surrounding parts of West Sussex.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side return extensions in Burgess Hill
How much does a side return extension cost in Burgess Hill?
In Burgess Hill, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £31,000–£44,500. Your fixed price depends on the survey and drawings.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
Will I need a party wall agreement?
Almost certainly in England and Wales, because side returns sit on or near the boundary. Notices must be served before work starts, and a party wall surveyor may be appointed if the neighbour does not consent.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
How long does a side return extension take in Burgess Hill?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.