What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Burntwood?
In Burntwood, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £27,000–£38,500. Building costs in the West Midlands are close to the UK average, so the figures for Burntwood are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £18,000–£25,500 |
| Typical project (12 m²) | £27,000–£38,500 |
| Larger project (17 m²) | £38,000–£54,500 |
| Rate per m² | £2,250–£3,200 |
The biggest cost drivers are:
- Moving drains and soil stacks
- Steel beams and propping of the back addition
- Access through the house for materials
- Glazed roof specification
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Burntwood?
Here is how the rules work for a side return extension in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Survey of party walls, drains and the existing back addition
- Party wall advice and notices
- Glazed or solid roof with insulation
- Floor levelling, heating and electrics
- Steel beams to remove the side wall
- Building control sign-off
How long does it take?
Allow 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Burntwood
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
Our Burntwood coverage includes postcode districts WS7, and we also work in nearby places such as Great Wyrley, Lichfield and Cannock.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Burntwood
How much does a side return extension cost in Burntwood?
In Burntwood, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £27,000–£38,500. Your fixed price depends on the survey and drawings.
Do you build side return extensions in Burntwood?
Yes. We build side return extensions across Burntwood, including postcodes WS7. Every project starts with a free home visit.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.