What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Crawley?
In Crawley, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £31,000–£44,500. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £21,000–£29,500 |
| Typical project (12 m²) | £31,000–£44,500 |
| Larger project (17 m²) | £44,000–£63,000 |
| Rate per m² | £2,600–£3,700 |
The biggest cost drivers are:
- Steel beams and propping of the back addition
- Access through the house for materials
- Length of the side return
- Glazed roof specification
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side return extension in Crawley?
Here is how the rules work for a side return extension in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
On a typical side return extension we handle:
- Survey of party walls, drains and the existing back addition
- Floor levelling, heating and electrics
- Party wall advice and notices
- Steel beams to remove the side wall
- Glazed or solid roof with insulation
- Drawings and planning or permitted development check
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Crawley
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
Projects in Crawley (RH11 and RH77) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Crawley
Do you build side return extensions in Crawley?
Yes. We build side return extensions across Crawley, including postcodes RH11 and RH77. Every project starts with a free home visit.
How much does a side return extension cost in Crawley?
In Crawley, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £31,000–£44,500. Your fixed price depends on the survey and drawings.
Does a side return extension need planning permission?
It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
