What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Daventry?
In Daventry, a side return extension typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £26,500–£38,000. That range is adjusted for the East Midlands, where domestic building work typically costs around 5% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £17,500–£25,000 |
| Typical project (12 m²) | £26,500–£38,000 |
| Larger project (17 m²) | £37,500–£53,500 |
| Rate per m² | £2,200–£3,150 |
The main things that change the cost:
- Steel beams and propping of the back addition
- Access through the house for materials
- Length of the side return
- Glazed roof specification
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a side return extension in Daventry?
Approvals for a side return extension in Daventry follow the rules for England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
What we take care of:
- Building control sign-off
- Survey of party walls, drains and the existing back addition
- Glazed or solid roof with insulation
- Floor levelling, heating and electrics
- Foundations and drainage, including any build-over agreement
- Steel beams to remove the side wall
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Daventry
In the East Midlands, many estates built since the 1960s have integral garages that convert well into a study or bedroom.
Daventry sits in Northamptonshire, about 12 miles west of Northampton. We cover the whole of Daventry, including postcodes NN11.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about side return extensions in Daventry
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How much does a side return extension cost in Daventry?
In Daventry, a side return extension typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £26,500–£38,000. Your fixed price depends on the survey and drawings.
Do you build side return extensions in Daventry?
Yes. We build side return extensions across Daventry, including postcodes NN11. Every project starts with a free home visit.
Does a side return extension need planning permission?
It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
