Side return extensions in Esher

A side return extension in Esher starts with understanding the house: its age, its structure and its plot. We survey, design, apply for approvals and build, all under one contract.

Guide price in Esher

£2,600–£3,700 per m² of floor area

In Esher, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £31,000–£44,500.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side return extension?

Kitchen-diner in a Victorian terrace with a long sloping glass roof along the side return

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.

How much does a side return extension cost in Esher?

In Esher, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £31,000–£44,500. That range is adjusted for the South East, where domestic building work typically costs around 12% above the national average. Design, structural calculations and council fees are extra.

Guide prices for Esher, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (8 m²)£21,000–£29,500
Typical project (12 m²)£31,000–£44,500
Larger project (17 m²)£44,000–£63,000
Rate per m²£2,600–£3,700

Your quote will depend mainly on:

  • Length of the side return
  • Steel beams and propping of the back addition
  • Party wall surveyor fees
  • Moving drains and soil stacks

For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.

Do you need planning permission for a side return extension in Esher?

Here is how the rules work for a side return extension in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.

Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.

We check this for your address before design work starts, so there are no surprises later.

What we handle

On a typical side return extension we handle:

  • Foundations and drainage, including any build-over agreement
  • Survey of party walls, drains and the existing back addition
  • Drawings and planning or permitted development check
  • Steel beams to remove the side wall
  • Floor levelling, heating and electrics
  • Building control sign-off

How long does it take?

Expect 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.

Building in Esher

The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.

From KT10 outwards, we take on projects throughout Esher and the surrounding parts of Surrey.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Drawings and written quote

    We prepare the design and give you a written, itemised quote with inclusions and exclusions.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about side return extensions in Esher

Does a side return extension need planning permission?

It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.

How long does a side return extension take in Esher?

Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.

Can I stay in the house?

Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.

How much does a side return extension cost in Esher?

In Esher, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £31,000–£44,500. Your fixed price depends on the survey and drawings.

How do you get materials in?

Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.