What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Gillingham?
In Gillingham, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £31,000–£44,500. Prices across the South East are typically 12% above the UK average for this kind of work, which is reflected in the range for Gillingham. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £21,000–£29,500 |
| Typical project (12 m²) | £31,000–£44,500 |
| Larger project (17 m²) | £44,000–£63,000 |
| Rate per m² | £2,600–£3,700 |
The main things that change the cost:
- Glazed roof specification
- Steel beams and propping of the back addition
- Party wall surveyor fees
- Access through the house for materials
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Gillingham?
Here is how the rules work for a side return extension in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a side return extension:
- Party wall advice and notices
- Survey of party walls, drains and the existing back addition
- Floor levelling, heating and electrics
- Drawings and planning or permitted development check
- Glazed or solid roof with insulation
- Steel beams to remove the side wall
How long does it take?
Build time is typically 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Gillingham
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
We work across Gillingham and neighbouring areas such as Chatham, Rochester and Strood. Postcodes we cover in Gillingham include ME7.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side return extensions in Gillingham
How much does a side return extension cost in Gillingham?
In Gillingham, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £31,000–£44,500. Your fixed price depends on the survey and drawings.
Who approves a side return extension in Gillingham?
Planning matters in Gillingham go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
Will I need a party wall agreement?
Almost certainly in England and Wales, because side returns sit on or near the boundary. Notices must be served before work starts, and a party wall surveyor may be appointed if the neighbour does not consent.
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.