A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Hazel Grove?
In Hazel Grove, a side return extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £26,000–£37,000. We start from a UK-wide guide and adjust it for the North West, where labour and materials are typically about 6% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £17,000–£25,000 |
| Typical project (12 m²) | £26,000–£37,000 |
| Larger project (17 m²) | £36,500–£52,500 |
| Rate per m² | £2,150–£3,100 |
The main things that change the cost:
- Steel beams and propping of the back addition
- Party wall surveyor fees
- Access through the house for materials
- Moving drains and soil stacks
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Hazel Grove?
The approval route for Hazel Grove is set by planning law in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a side return extension:
- Party wall advice and notices
- Drawings and planning or permitted development check
- Glazed or solid roof with insulation
- Foundations and drainage, including any build-over agreement
- Floor levelling, heating and electrics
- Building control sign-off
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Hazel Grove
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
We work across Hazel Grove and neighbouring areas such as Stockport, Cheadle Hulme and Hyde. Postcodes we cover in Hazel Grove include SK7.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side return extensions in Hazel Grove
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How much does a side return extension cost in Hazel Grove?
In Hazel Grove, a side return extension typically costs £2,150–£3,100 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £26,000–£37,000. Your fixed price depends on the survey and drawings.
Does a side return extension need planning permission?
It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.
How long does a side return extension take in Hazel Grove?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.