What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Leicestershire?
In Leicestershire, a side return extension typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £26,500–£38,000. The guide for Leicestershire reflects typical costs in the East Midlands, roughly 5% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £17,500–£25,000 |
| Typical project (12 m²) | £26,500–£38,000 |
| Larger project (17 m²) | £37,500–£53,500 |
| Rate per m² | £2,200–£3,150 |
The main things that change the cost:
- Moving drains and soil stacks
- Length of the side return
- Glazed roof specification
- Access through the house for materials
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Leicestershire?
The approval route for Leicestershire is set by planning law in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a side return extension:
- Party wall advice and notices
- Foundations and drainage, including any build-over agreement
- Steel beams to remove the side wall
- Building control sign-off
- Drawings and planning or permitted development check
- Survey of party walls, drains and the existing back addition
How long does it take?
Allow 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Leicestershire
The East Midlands has a mix of red-brick terraces, inter-war semis and newer estates, so rear extensions and garage conversions are common projects.
Towns we cover in Leicestershire include Leicester, Loughborough, Hinckley, Coalville, Wigston Magna and Melton Mowbray.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Leicestershire
How much does a side return extension cost in Leicestershire?
In Leicestershire, a side return extension typically costs £2,200–£3,150 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £26,500–£38,000. Your fixed price depends on the survey and drawings.
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How long does a side return extension take in Leicestershire?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.