What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Lisburn?
In Lisburn, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £24,000–£34,000. That range is adjusted for Northern Ireland, where domestic building work typically costs around 14% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £16,000–£23,000 |
| Typical project (12 m²) | £24,000–£34,000 |
| Larger project (17 m²) | £34,000–£48,500 |
| Rate per m² | £2,000–£2,850 |
The biggest cost drivers are:
- Steel beams and propping of the back addition
- Moving drains and soil stacks
- Glazed roof specification
- Access through the house for materials
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Lisburn?
The approval route for Lisburn is set by planning law in Northern Ireland. In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
Northern Ireland has no Party Wall Act. Work on shared walls relies on agreement with the neighbour and common law, so we agree the arrangements in writing before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most side return extensions:
- Building control sign-off
- Glazed or solid roof with insulation
- Foundations and drainage, including any build-over agreement
- Written agreement with neighbours on shared walls
- Drawings and planning or permitted development check
- Steel beams to remove the side wall
How long does it take?
Allow 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Lisburn
Across Northern Ireland, bungalows and chalet bungalows are common, so loft conversions and rear extensions are popular projects.
We work across Lisburn and neighbouring areas such as Belfast, Newtownabbey and Newtownards. Postcodes we cover in Lisburn include BT27 and BT28.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Lisburn
Do I need planning permission for a side return extension in Lisburn?
In Northern Ireland a single-storey side infill can be permitted development if it is no more than 4 metres high and no wider than half the original house; conservation areas need planning permission. Building control approval is needed before work starts.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
How much does a side return extension cost in Lisburn?
In Lisburn, a side return extension typically costs £2,000–£2,850 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £24,000–£34,000. Your fixed price depends on the survey and drawings.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How long does a side return extension take in Lisburn?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.