Side return extensions in Newmarket

Thinking about a side return extension in Newmarket? We can take it from first ideas to finished, signed-off work, with a written programme before work starts.

Guide price in Newmarket

£2,450–£3,500 per m² of floor area

In Newmarket, a side return extension typically costs £2,450–£3,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £29,500–£42,000.

Book a free home visit

Tell us about your project. We reply to arrange a visit and a fixed quote.

Free home visit and measured survey
Fixed price for the agreed specification
Drawings, approvals and build in one contract
Building control sign-off arranged
England, Wales, Scotland and Northern Ireland

What is a side return extension?

Kitchen-diner in a Victorian terrace with a long sloping glass roof along the side return

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.

How much does a side return extension cost in Newmarket?

In Newmarket, a side return extension typically costs £2,450–£3,500 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £29,500–£42,000. Building costs in the East of England run about 6% above the UK average, and the figures for Newmarket are adjusted to reflect that. Design, structural calculations and council fees are extra.

Guide prices for Newmarket, including VAT at 20% (standard rate)
Size or typeGuide range
Smaller project (8 m²)£19,500–£28,000
Typical project (12 m²)£29,500–£42,000
Larger project (17 m²)£41,500–£59,500
Rate per m²£2,450–£3,500

Your quote will depend mainly on:

  • Steel beams and propping of the back addition
  • Moving drains and soil stacks
  • Access through the house for materials
  • Glazed roof specification

A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.

Do you need planning permission for a side return extension in Newmarket?

The approval route for Newmarket is set by planning law in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.

Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.

Our first visit includes a check of your planning history, so you know the route before paying for drawings.

What we handle

What we take care of:

  • Foundations and drainage, including any build-over agreement
  • Party wall advice and notices
  • Steel beams to remove the side wall
  • Building control sign-off
  • Glazed or solid roof with insulation
  • Survey of party walls, drains and the existing back addition

How long does it take?

Build time is typically 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.

Building in Newmarket

Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.

Projects in Newmarket (CB8) are surveyed in person before we quote, so the price reflects your actual property.

How it works

  1. 01

    Survey and brief

    We visit, discuss your ideas and budget, and survey the property or site at no cost.

  2. 02

    Design and fixed quote

    Drawings, structural calculations and an itemised, fixed price for the agreed specification.

  3. 03

    Permissions sorted

    Applications, building control and neighbour arrangements, all before the start date.

  4. 04

    Construction and completion

    We build, put right any snags and hand over the building control certificate.

Questions about side return extensions in Newmarket

Is a glass roof too hot or cold?

Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.

How much space does a side return add?

Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.

Will I need a party wall agreement?

Almost certainly in England and Wales, because side returns sit on or near the boundary. Notices must be served before work starts, and a party wall surveyor may be appointed if the neighbour does not consent.

Who approves a side return extension in Newmarket?

Planning matters in Newmarket go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.

How much does a side return extension cost in Newmarket?

In Newmarket, a side return extension typically costs £2,450–£3,500 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £29,500–£42,000. Your fixed price depends on the survey and drawings.

Start with a guide price, then book a free survey for a fixed quote in Newmarket.

Call 0800 088 6248 or get an instant guide price online.

Call 0800 088 6248Get a guide price