What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Southsea?
In Southsea, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £31,000–£44,500. Building costs in the South East run about 12% above the UK average, and the figures for Southsea are adjusted to reflect that. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £21,000–£29,500 |
| Typical project (12 m²) | £31,000–£44,500 |
| Larger project (17 m²) | £44,000–£63,000 |
| Rate per m² | £2,600–£3,700 |
The main things that change the cost:
- Steel beams and propping of the back addition
- Access through the house for materials
- Moving drains and soil stacks
- Party wall surveyor fees
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a side return extension in Southsea?
Approvals for a side return extension in Southsea follow the rules for England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a side return extension:
- Foundations and drainage, including any build-over agreement
- Drawings and planning or permitted development check
- Floor levelling, heating and electrics
- Building control sign-off
- Steel beams to remove the side wall
- Survey of party walls, drains and the existing back addition
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Before that, surveys, drawings and approvals usually take 3 to 4 months, longer if the council asks for changes.
Building in Southsea
The South East has a broad mix of housing, from Victorian terraces in the towns to post-war semis and newer estates, so extension types vary street by street.
From PO4 outwards, we take on projects throughout Southsea and the surrounding parts of Hampshire.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side return extensions in Southsea
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
How much does a side return extension cost in Southsea?
In Southsea, a side return extension typically costs £2,600–£3,700 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £31,000–£44,500. Your fixed price depends on the survey and drawings.
Does a side return extension need planning permission?
It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.
How long does a side return extension take in Southsea?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.