What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Stornoway?
In Stornoway, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £27,000–£38,500. Island and remote projects usually cost more than this guide because of shipping, travel and accommodation. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £18,000–£25,500 |
| Typical project (12 m²) | £27,000–£38,500 |
| Larger project (17 m²) | £38,000–£54,500 |
| Rate per m² | £2,250–£3,200 |
Your quote will depend mainly on:
- Moving drains and soil stacks
- Agreements with neighbours on shared walls
- Glazed roof specification
- Access through the house for materials
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Stornoway?
Before anything is built in Stornoway, we confirm which approvals apply in Scotland. In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
In Scotland a building warrant is needed before work starts on most extensions, loft conversions and conversions. It is issued by the council’s building standards service. When the work is finished, a completion certificate is submitted and accepted by the council after inspection.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most side return extensions:
- Foundations and drainage, including any build-over agreement
- Written agreement with neighbours on shared walls
- Steel beams to remove the side wall
- Written agreement with neighbours on shared walls
- Drawings and planning or permitted development check
- Building control sign-off
How long does it take?
The build itself usually takes 10 to 14 weeks on site. Allow time beforehand for drawings and approvals, usually 3 to 4 months.
Building in Stornoway
In Scotland, bungalows and one-and-a-half-storey homes are common, so dormer conversions are a popular way to add bedrooms.
Because Stornoway is reached by sea, we confirm availability before quoting and list shipping and travel costs separately.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about side return extensions in Stornoway
How much space does a side return add?
Typically 1.5 to 2.5 metres of width along the back addition. It often turns a narrow galley kitchen into a family kitchen-diner.
Can I stay in the house?
Usually, though the kitchen will be out of action for several weeks. We plan a temporary kitchen area where possible.
Do I need planning permission for a side return extension in Stornoway?
In Scotland a single-storey infill beside a back addition can be permitted development within the height and boundary limits, but not in a conservation area. A building warrant is needed before work starts.
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
How long does a side return extension take in Stornoway?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
How much does a side return extension cost in Stornoway?
In Stornoway, a side return extension typically costs £2,250–£3,200 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £27,000–£38,500. Your fixed price depends on the survey and drawings.