What is a side return extension?

A side return extension fills the narrow passage that runs alongside the back addition of many Victorian and Edwardian terraced houses. It widens a galley kitchen into a proper kitchen-diner, usually with a sloping glazed roof to keep the room bright.
How much does a side return extension cost in Torquay?
In Torquay, a side return extension typically costs £2,350–£3,350 per m² of floor area, including VAT at 20% (standard rate). For a typical 12 m² project that is roughly £28,000–£40,000. Building costs in the South West are close to the UK average, so the figures for Torquay are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (8 m²) | £19,000–£27,000 |
| Typical project (12 m²) | £28,000–£40,000 |
| Larger project (17 m²) | £40,000–£57,000 |
| Rate per m² | £2,350–£3,350 |
The main things that change the cost:
- Party wall surveyor fees
- Glazed roof specification
- Moving drains and soil stacks
- Access through the house for materials
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a side return extension in Torquay?
Whether you need planning permission depends on your house and its location in England. In England a side return infill is treated as a side extension. It may be permitted development if it is single-storey, no more than 4 metres high and no wider than half the original house, but not in a conservation area. Because side returns sit on the boundary, party wall notices are almost always needed.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
On a typical side return extension we handle:
- Steel beams to remove the side wall
- Party wall advice and notices
- Foundations and drainage, including any build-over agreement
- Glazed or solid roof with insulation
- Drawings and planning or permitted development check
- Survey of party walls, drains and the existing back addition
How long does it take?
Allow 10 to 14 weeks on site. Design and approvals come first and typically take 3 to 4 months, depending on the approval route.
Building in Torquay
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
From TQ2 outwards, we take on projects throughout Torquay and the surrounding parts of Devon.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about side return extensions in Torquay
Is a glass roof too hot or cold?
Modern solar-control double or triple glazing reduces glare and heat loss. Building regulations also limit how much glazing you can have unless the design shows it performs well enough.
How much does a side return extension cost in Torquay?
In Torquay, a side return extension typically costs £2,350–£3,350 per m² of floor area, including VAT at 20% (standard rate). A typical 12 m² project comes to roughly £28,000–£40,000. Your fixed price depends on the survey and drawings.
How do you get materials in?
Mid-terrace houses often have no rear access, so materials come through the house. We protect floors and plan deliveries carefully.
How long does a side return extension take in Torquay?
Typically 10 to 14 weeks on site. Design and approvals beforehand usually take 3 to 4 months.
Does a side return extension need planning permission?
It depends on the design and where you live. In England a side return can sometimes be permitted development, but side extensions in conservation areas and on many terraced streets need an application. We check your house’s rights before designing.