What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Cambuslang?
In Cambuslang, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £38,000–£56,000. Building costs in Scotland are close to the UK average, so the figures for Cambuslang are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,500–£39,000 |
| Typical project (20 m²) | £38,000–£56,000 |
| Larger project (28 m²) | £53,000–£78,500 |
| Rate per m² | £1,900–£2,800 |
Your quote will depend mainly on:
- How much of the existing house is opened up
- Kitchen, flooring and finishes, which we can include or leave to you
- Floor area and the length of new wall
- Glazing: sliding and bifold doors cost more than French doors
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Cambuslang?
Whether you need planning permission depends on your house and its location in Scotland. In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Scotland has no Party Wall Act. Work on shared walls is governed by your title deeds, the Tenements (Scotland) Act 2004 for flats, and common law, so we agree arrangements with neighbours in writing before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a single-storey extension:
- Structural calculations for steels and lintels
- Doors, windows and roof glazing installed
- Measured survey and design drawings
- First and second fix electrics, heating and plastering
- Foundations, drainage and any build-over agreement
- Knock-through to the existing house with steel beams
How long does it take?
Build time is typically 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Cambuslang
Scotland’s housing ranges from sandstone tenements and villas to post-war and modern estates, and the building warrant system shapes how projects are planned.
Projects in Cambuslang (G72) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about single-storey extensions in Cambuslang
How much does a single-storey extension cost in Cambuslang?
In Cambuslang, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £38,000–£56,000. Your fixed price depends on the survey and drawings.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Who approves a single-storey extension in Cambuslang?
Planning matters in Cambuslang go to the council covering your address, and the work needs a building warrant. We prepare and submit the applications for you.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
Do I need planning permission for a single-storey extension in Cambuslang?
In Scotland a single-storey extension is often permitted development (Class 1A): where any part is within 1 metre of a boundary, it can project up to 3 metres from the rear wall of a terraced house or 4 metres on other houses, with eaves no higher than 3 metres, an overall height of 4 metres and no more than half the front or rear garden covered. The rights do not apply in conservation areas or to flats, and a building warrant will usually still be needed before work starts.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
