What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Doncaster?
In Doncaster, a single-storey extension typically costs £1,800–£2,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £36,000–£54,000. The guide for Doncaster reflects typical costs in Yorkshire and the Humber, roughly 7% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £25,000–£38,000 |
| Typical project (20 m²) | £36,000–£54,000 |
| Larger project (28 m²) | £50,500–£75,500 |
| Rate per m² | £1,800–£2,700 |
What moves the price most:
- How much of the existing house is opened up
- Ground conditions and foundation depth
- Kitchen, flooring and finishes, which we can include or leave to you
- Roof type and the size of any lantern or roof windows
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Doncaster?
Here is how the rules work for a single-storey extension in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
What we take care of:
- Doors, windows and roof glazing installed
- First and second fix electrics, heating and plastering
- Structural calculations for steels and lintels
- Building control inspections and completion certificate
- Measured survey and design drawings
- Knock-through to the existing house with steel beams
How long does it take?
Expect 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Doncaster
Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.
Doncaster sits in South Yorkshire, about 17 miles north-east of Sheffield. We cover the whole of Doncaster, including postcodes DN1, DN2 and DN55.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Doncaster
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How much does a single-storey extension cost in Doncaster?
In Doncaster, a single-storey extension typically costs £1,800–£2,700 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £36,000–£54,000. Your fixed price depends on the survey and drawings.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
How long does a single-storey extension take in Doncaster?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.