What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Great Wyrley?
In Great Wyrley, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £38,000–£56,000. Building costs in the West Midlands are close to the UK average, so the figures for Great Wyrley are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,500–£39,000 |
| Typical project (20 m²) | £38,000–£56,000 |
| Larger project (28 m²) | £53,000–£78,500 |
| Rate per m² | £1,900–£2,800 |
Your quote will depend mainly on:
- Kitchen, flooring and finishes, which we can include or leave to you
- Ground conditions and foundation depth
- Glazing: sliding and bifold doors cost more than French doors
- Roof type and the size of any lantern or roof windows
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Great Wyrley?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
From survey to sign-off, the job normally involves:
- Measured survey and design drawings
- Structural calculations for steels and lintels
- Building control inspections and completion certificate
- First and second fix electrics, heating and plastering
- Foundations, drainage and any build-over agreement
- Cavity walls, insulation and roof to current building regulations
How long does it take?
Expect 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Great Wyrley
Across the West Midlands, inter-war and post-war semis make up much of the housing, giving good scope for two-storey side extensions and hip-to-gable lofts.
Our Great Wyrley coverage includes postcode districts WS6, and we also work in nearby places such as Cannock, Bloxwich and Burntwood.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Great Wyrley
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How long does a single-storey extension take in Great Wyrley?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
How much does a single-storey extension cost in Great Wyrley?
In Great Wyrley, a single-storey extension typically costs £1,900–£2,800 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £38,000–£56,000. Your fixed price depends on the survey and drawings.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
