What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Hyde?
In Hyde, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £37,000–£55,000. We start from a UK-wide guide and adjust it for the North West, where labour and materials are typically about 6% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,000–£38,500 |
| Typical project (20 m²) | £37,000–£55,000 |
| Larger project (28 m²) | £52,000–£77,000 |
| Rate per m² | £1,850–£2,750 |
Your quote will depend mainly on:
- Kitchen, flooring and finishes, which we can include or leave to you
- Roof type and the size of any lantern or roof windows
- How much of the existing house is opened up
- Glazing: sliding and bifold doors cost more than French doors
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Hyde?
Approvals for a single-storey extension in Hyde follow the rules for England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
The work we manage on a single-storey extension:
- Doors, windows and roof glazing installed
- Structural calculations for steels and lintels
- Cavity walls, insulation and roof to current building regulations
- Foundations, drainage and any build-over agreement
- First and second fix electrics, heating and plastering
- Building control inspections and completion certificate
How long does it take?
Expect 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Hyde
Terraced streets across the North West often suit rear dormers and single-storey kitchen extensions.
Projects in Hyde (SK14) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Hyde
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
How long does a single-storey extension take in Hyde?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
How much does a single-storey extension cost in Hyde?
In Hyde, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £37,000–£55,000. Your fixed price depends on the survey and drawings.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.