What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Keighley?
In Keighley, a single-storey extension typically costs £1,800–£2,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £36,000–£54,000. The guide for Keighley reflects typical costs in Yorkshire and the Humber, roughly 7% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £25,000–£38,000 |
| Typical project (20 m²) | £36,000–£54,000 |
| Larger project (28 m²) | £50,500–£75,500 |
| Rate per m² | £1,800–£2,700 |
Your quote will depend mainly on:
- Roof type and the size of any lantern or roof windows
- Glazing: sliding and bifold doors cost more than French doors
- How much of the existing house is opened up
- Ground conditions and foundation depth
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Keighley?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
Our first visit includes a check of your planning history, so you know the route before paying for drawings.
What we handle
The work we manage on a single-storey extension:
- Measured survey and design drawings
- Structural calculations for steels and lintels
- Doors, windows and roof glazing installed
- First and second fix electrics, heating and plastering
- Cavity walls, insulation and roof to current building regulations
- Knock-through to the existing house with steel beams
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Keighley
Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.
If your home is in Keighley or close by in Bingley, Shipley and Guiseley, a free home visit is the first step.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Keighley
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How much does a single-storey extension cost in Keighley?
In Keighley, a single-storey extension typically costs £1,800–£2,700 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £36,000–£54,000. Your fixed price depends on the survey and drawings.
How long does a single-storey extension take in Keighley?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.