What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Maesteg?
In Maesteg, a single-storey extension typically costs £1,800–£2,650 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £36,000–£53,000. The guide for Maesteg reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £25,000–£37,000 |
| Typical project (20 m²) | £36,000–£53,000 |
| Larger project (28 m²) | £50,500–£74,000 |
| Rate per m² | £1,800–£2,650 |
What moves the price most:
- How much of the existing house is opened up
- Roof type and the size of any lantern or roof windows
- Floor area and the length of new wall
- Ground conditions and foundation depth
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Maesteg?
Here is how the rules work for a single-storey extension in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most single-storey extensions:
- Structural calculations for steels and lintels
- Foundations, drainage and any build-over agreement
- Knock-through to the existing house with steel beams
- Cavity walls, insulation and roof to current building regulations
- Measured survey and design drawings
- Doors, windows and roof glazing installed
How long does it take?
Build time is typically 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Maesteg
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
We work across Maesteg and neighbouring areas such as Neath, Bridgend and Tonypandy. Postcodes we cover in Maesteg include CF34.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Maesteg
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
Do I need planning permission for a single-storey extension in Maesteg?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Who approves a single-storey extension in Maesteg?
Planning matters in Maesteg go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a single-storey extension cost in Maesteg?
In Maesteg, a single-storey extension typically costs £1,800–£2,650 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £36,000–£53,000. Your fixed price depends on the survey and drawings.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.