What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Prestatyn?
In Prestatyn, a single-storey extension typically costs £1,800–£2,650 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £36,000–£53,000. The guide for Prestatyn reflects typical costs in Wales, roughly 8% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £25,000–£37,000 |
| Typical project (20 m²) | £36,000–£53,000 |
| Larger project (28 m²) | £50,500–£74,000 |
| Rate per m² | £1,800–£2,650 |
The biggest cost drivers are:
- Glazing: sliding and bifold doors cost more than French doors
- Floor area and the length of new wall
- How much of the existing house is opened up
- Kitchen, flooring and finishes, which we can include or leave to you
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a single-storey extension in Prestatyn?
Before anything is built in Prestatyn, we confirm which approvals apply in Wales. In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
Building regulations in Wales are set by the Welsh Government. Approval comes from the council’s building control service or a registered building control approver, with inspections during the work and a completion certificate at the end.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
From survey to sign-off, the job normally involves:
- Knock-through to the existing house with steel beams
- Measured survey and design drawings
- Cavity walls, insulation and roof to current building regulations
- Doors, windows and roof glazing installed
- Structural calculations for steels and lintels
- Foundations, drainage and any build-over agreement
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Prestatyn
Terraced houses in Welsh towns often have narrow plots, which suits rear and side return extensions and rear dormers.
Prestatyn sits in Clwyd, about 26 miles north-west of Wrexham. We cover the whole of Prestatyn, including postcodes LL19.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Prestatyn
Is VAT charged on an extension?
Yes. Building work on an existing home is standard-rated, so VAT at 20% applies. Our guide prices include it.
Who approves a single-storey extension in Prestatyn?
Planning matters in Prestatyn go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How much does a single-storey extension cost in Prestatyn?
In Prestatyn, a single-storey extension typically costs £1,800–£2,650 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £36,000–£53,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a single-storey extension in Prestatyn?
In Wales a single-storey rear extension is often permitted development: up to 4 metres beyond the rear wall and up to 4 metres high, with eaves no higher than 3 metres within 2 metres of a boundary and no more than half the land around the original house covered. Wales has no larger home extension prior approval route, so deeper extensions need a planning application, as do extensions to flats, listed buildings and houses whose rights have been removed.
