What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Sheffield?
In Sheffield, a single-storey extension typically costs £1,800–£2,700 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £36,000–£54,000. We start from a UK-wide guide and adjust it for Yorkshire and the Humber, where labour and materials are typically about 7% below average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £25,000–£38,000 |
| Typical project (20 m²) | £36,000–£54,000 |
| Larger project (28 m²) | £50,500–£75,500 |
| Rate per m² | £1,800–£2,700 |
The biggest cost drivers are:
- Roof type and the size of any lantern or roof windows
- How much of the existing house is opened up
- Kitchen, flooring and finishes, which we can include or leave to you
- Ground conditions and foundation depth
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Sheffield?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
Handled as part of most single-storey extensions:
- Cavity walls, insulation and roof to current building regulations
- Doors, windows and roof glazing installed
- Foundations, drainage and any build-over agreement
- Structural calculations for steels and lintels
- Measured survey and design drawings
- Knock-through to the existing house with steel beams
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Allow time beforehand for drawings and approvals, usually 6 to 12 weeks.
Building in Sheffield
Yorkshire and the Humber has stone and brick terraces as well as inter-war and newer estates, so materials matching is an early design question.
If your home is in Sheffield or close by in Rotherham, Dronfield and Chapeltown, a free home visit is the first step.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Construction and completion
We build, put right any snags and hand over the building control certificate.
Questions about single-storey extensions in Sheffield
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How much does a single-storey extension cost in Sheffield?
In Sheffield, a single-storey extension typically costs £1,800–£2,700 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £36,000–£54,000. Your fixed price depends on the survey and drawings.
Who approves a single-storey extension in Sheffield?
Planning matters in Sheffield go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
