What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Stevenage?
In Stevenage, a single-storey extension typically costs £2,050–£3,050 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £41,000–£61,000. The guide for Stevenage reflects typical costs in the East of England, roughly 6% above the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £28,500–£42,500 |
| Typical project (20 m²) | £41,000–£61,000 |
| Larger project (28 m²) | £57,500–£85,500 |
| Rate per m² | £2,050–£3,050 |
The biggest cost drivers are:
- Ground conditions and foundation depth
- Kitchen, flooring and finishes, which we can include or leave to you
- How much of the existing house is opened up
- Glazing: sliding and bifold doors cost more than French doors
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a single-storey extension in Stevenage?
Whether you need planning permission depends on your house and its location in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most single-storey extensions:
- First and second fix electrics, heating and plastering
- Building control inspections and completion certificate
- Structural calculations for steels and lintels
- Measured survey and design drawings
- Knock-through to the existing house with steel beams
- Cavity walls, insulation and roof to current building regulations
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Stevenage
Many towns in the East of England have estates built since the 1970s, where garage conversions and rear extensions are popular.
Projects in Stevenage (SG1) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and fixed quote
Drawings, structural calculations and an itemised, fixed price for the agreed specification.
- 03
Approvals
Planning or permitted development confirmation, building regulations and any party wall matters.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Stevenage
How long does a single-storey extension take in Stevenage?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How much does a single-storey extension cost in Stevenage?
In Stevenage, a single-storey extension typically costs £2,050–£3,050 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £41,000–£61,000. Your fixed price depends on the survey and drawings.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
