What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Stretford?
In Stretford, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £37,000–£55,000. The guide for Stretford reflects typical costs in the North West, roughly 6% below the UK-wide figure. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,000–£38,500 |
| Typical project (20 m²) | £37,000–£55,000 |
| Larger project (28 m²) | £52,000–£77,000 |
| Rate per m² | £1,850–£2,750 |
What moves the price most:
- Roof type and the size of any lantern or roof windows
- Glazing: sliding and bifold doors cost more than French doors
- Floor area and the length of new wall
- How much of the existing house is opened up
Your exact price depends on the survey and drawings. The guide price tool gives a quick range in the meantime.
Do you need planning permission for a single-storey extension in Stretford?
The approval route for Stretford is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
We check this for your address before design work starts, so there are no surprises later.
What we handle
The work we manage on a single-storey extension:
- Measured survey and design drawings
- Foundations, drainage and any build-over agreement
- Doors, windows and roof glazing installed
- First and second fix electrics, heating and plastering
- Knock-through to the existing house with steel beams
- Cavity walls, insulation and roof to current building regulations
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Before that, surveys, drawings and approvals usually take 6 to 12 weeks, longer if the council asks for changes.
Building in Stretford
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
We work across Stretford and neighbouring areas such as Urmston, Sale and Eccles. Postcodes we cover in Stretford include M32.
How it works
- 01
Free visit
We look at the property, talk through what you want and measure up. There is no charge and no obligation.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Permissions sorted
Applications, building control and neighbour arrangements, all before the start date.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about single-storey extensions in Stretford
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.
How much does a single-storey extension cost in Stretford?
In Stretford, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £37,000–£55,000. Your fixed price depends on the survey and drawings.
Do you build single-storey extensions in Stretford?
Yes. We build single-storey extensions across Stretford, including postcodes M32. Every project starts with a free home visit.
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.