What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Stroud?
In Stroud, a single-storey extension typically costs £2,000–£2,950 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £40,000–£59,000. Building costs in the South West are close to the UK average, so the figures for Stroud are close to our national guide. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £28,000–£41,500 |
| Typical project (20 m²) | £40,000–£59,000 |
| Larger project (28 m²) | £56,000–£82,500 |
| Rate per m² | £2,000–£2,950 |
What moves the price most:
- Roof type and the size of any lantern or roof windows
- How much of the existing house is opened up
- Kitchen, flooring and finishes, which we can include or leave to you
- Floor area and the length of new wall
Use the guide price tool to see how size and specification change the figure, then ask for a written, itemised quote.
Do you need planning permission for a single-storey extension in Stroud?
The approval route for Stroud is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Building regulations approval comes from the council’s building control service or a registered building control approver. The work is inspected at key stages, such as foundations, drainage and insulation, and a completion certificate is issued at the end.
At the survey we check your house’s planning history and any restrictions, and tell you which route applies.
What we handle
Handled as part of most single-storey extensions:
- Doors, windows and roof glazing installed
- Building control inspections and completion certificate
- Foundations, drainage and any build-over agreement
- Knock-through to the existing house with steel beams
- First and second fix electrics, heating and plastering
- Cavity walls, insulation and roof to current building regulations
How long does it take?
Allow 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Stroud
The South West mixes stone and render cottages with post-war and newer estates, and local materials matter more here when matching an extension.
Projects in Stroud (GL5) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and sign-off
We run the build to a written programme and hand over the completion certificate.
Questions about single-storey extensions in Stroud
Do I need a party wall agreement?
If you are in England or Wales and the work involves a shared wall, building on the boundary or digging foundations close to a neighbour, the Party Wall etc. Act 1996 applies and notices must be served before work starts. We advise on this at the design stage.
How much does a single-storey extension cost in Stroud?
In Stroud, a single-storey extension typically costs £2,000–£2,950 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £40,000–£59,000. Your fixed price depends on the survey and drawings.
Who approves a single-storey extension in Stroud?
Planning matters in Stroud go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.