What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Walkden?
In Walkden, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £37,000–£55,000. That range is adjusted for the North West, where domestic building work typically costs around 6% below the national average. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £26,000–£38,500 |
| Typical project (20 m²) | £37,000–£55,000 |
| Larger project (28 m²) | £52,000–£77,000 |
| Rate per m² | £1,850–£2,750 |
What moves the price most:
- Floor area and the length of new wall
- How much of the existing house is opened up
- Roof type and the size of any lantern or roof windows
- Ground conditions and foundation depth
For a figure based on your own measurements, try the guide price tool, then book a free home visit for a fixed quote.
Do you need planning permission for a single-storey extension in Walkden?
Approvals for a single-storey extension in Walkden follow the rules for England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
We check this for your address before design work starts, so there are no surprises later.
What we handle
Handled as part of most single-storey extensions:
- Cavity walls, insulation and roof to current building regulations
- First and second fix electrics, heating and plastering
- Building control inspections and completion certificate
- Structural calculations for steels and lintels
- Foundations, drainage and any build-over agreement
- Knock-through to the existing house with steel beams
How long does it take?
Build time is typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Walkden
The North West has many brick terraces and inter-war semis, where kitchen extensions and dormer loft conversions add space without moving.
Walkden sits in Greater Manchester, about 7 miles west of Manchester. We cover the whole of Walkden, including postcodes M28.
How it works
- 01
Survey and brief
We visit, discuss your ideas and budget, and survey the property or site at no cost.
- 02
Design and pricing
Design options, then a fixed quote based on the chosen drawings and specification.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about single-storey extensions in Walkden
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
Do I need planning permission for a single-storey extension?
Not always. Many small rear extensions are permitted development, within limits on depth, height and how much of the garden is covered. The limits depend on which nation you live in and on protected areas such as conservation areas, and flats or houses whose rights have been removed need an application. We check this at the survey and can apply to the council for formal confirmation.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How much does a single-storey extension cost in Walkden?
In Walkden, a single-storey extension typically costs £1,850–£2,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £37,000–£55,000. Your fixed price depends on the survey and drawings.
How long does a single-storey extension take in Walkden?
Typically 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals beforehand usually take 6 to 12 weeks.