What is a single-storey extension?

A single-storey extension is a ground-floor addition, usually at the rear of a house, that enlarges a kitchen, living or dining space. Most are built with cavity walls on concrete foundations and finished with a flat roof and roof lantern or a pitched tiled roof.
How much does a single-storey extension cost in Woolwich?
In Woolwich, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). For a typical 20 m² project that is roughly £51,000–£75,000. Prices across London are typically 30% above the UK average for this kind of work, which is reflected in the range for Woolwich. Design, structural calculations and council fees are extra.
| Size or type | Guide range |
|---|---|
| Smaller project (14 m²) | £35,500–£52,500 |
| Typical project (20 m²) | £51,000–£75,000 |
| Larger project (28 m²) | £71,500–£105,000 |
| Rate per m² | £2,550–£3,750 |
What moves the price most:
- Roof type and the size of any lantern or roof windows
- How much of the existing house is opened up
- Floor area and the length of new wall
- Glazing: sliding and bifold doors cost more than French doors
A guide range is only a starting point: the guide price tool gives an instant figure for your size, and a free survey turns it into a fixed quote.
Do you need planning permission for a single-storey extension in Woolwich?
The approval route for Woolwich is set by planning law in England. In England a single-storey rear extension is often permitted development: broadly up to 3 metres deep on a semi-detached or terraced house and 4 metres on a detached house, no higher than 4 metres, with eaves no higher than 3 metres within 2 metres of a boundary, and covering no more than half the garden. The larger home extension scheme allows up to 6 or 8 metres if you notify the council first and neighbours have a chance to comment. In conservation areas, National Parks and National Landscapes the larger home extension route, side extensions and cladding are not permitted development. Flats and houses whose rights have been removed need a planning application, and listed buildings need listed building consent.
Where work involves a shared wall, building on the boundary, or digging foundations within 3 metres of a neighbour’s building and deeper than its foundations (or within 6 metres for deeper work), the Party Wall etc. Act 1996 applies and notices must be served before work starts.
If the answer is not clear-cut, we can apply for formal confirmation before you commit to the build.
What we handle
The work we manage on a single-storey extension:
- Building control inspections and completion certificate
- Knock-through to the existing house with steel beams
- First and second fix electrics, heating and plastering
- Foundations, drainage and any build-over agreement
- Structural calculations for steels and lintels
- Cavity walls, insulation and roof to current building regulations
How long does it take?
The build itself usually takes 10 to 14 weeks on site for a typical rear extension, after approvals. Design and approvals come first and typically take 6 to 12 weeks, depending on the approval route.
Building in Woolwich
Space is at a premium in London, so homeowners often build out into the side return or up into the roof rather than move.
Projects in Woolwich (SE18) are surveyed in person before we quote, so the price reflects your actual property.
How it works
- 01
Visit and measured survey
A free visit to understand the project, check access and take measurements.
- 02
Drawings and written quote
We prepare the design and give you a written, itemised quote with inclusions and exclusions.
- 03
Approvals in place
We handle planning, building control and neighbour notices before work starts.
- 04
Build and handover
Work follows the agreed programme, with inspections along the way and a completion certificate at the end.
Questions about single-storey extensions in Woolwich
Can I stay in the house during the build?
Usually yes. We build the shell before opening up the back wall, so the house stays weathertight for most of the job. There will be a few weeks when the kitchen or back room is out of use.
What is a build-over agreement?
If a public sewer runs within 3 metres of the extension, the water company normally has to agree to the work before it starts. We check sewer records during design and apply where needed.
How long does a single-storey extension take?
Once approvals are in place, a typical rear extension takes 10 to 14 weeks on site. Design and approvals usually take another 6 to 12 weeks beforehand, depending on whether a planning application is needed.
Who approves a single-storey extension in Woolwich?
Planning matters in Woolwich go to the council covering your address, and the work needs building control approval. We prepare and submit the applications for you.
How much does a single-storey extension cost in Woolwich?
In Woolwich, a single-storey extension typically costs £2,550–£3,750 per m² of floor area, including VAT at 20% (standard rate). A typical 20 m² project comes to roughly £51,000–£75,000. Your fixed price depends on the survey and drawings.
